top of page

Zublin Doha South Terminal Pumping Station

Client

Zublin

Location

Doha, Qatar

Project Duration

March 2018 - Ongoing

Project Value

$133 Million (Est.)

Brief Project Description

Project entails construction of Doha South Terminal Pumping Station & Regional Odour Control System.

The scope of work entails the following:
- Terminal Pump Station Shaft to a depth of 50 m below existing ground level and a diameter of approximately 37 m with a future peak pumping capacity of approximately 5,903 l/s
- Screen Shaft to a depth of 50 m below existing ground level and with an outer diameter of the shaft of approximately 26 m
- Regional Odour Control Facility
- Connections to IDRIS Main Trunk Sewer Line Shaft
- 2 x 1600-mm-ID shaft connections between Screen Shaft and Terminal Pumping Shaft
- 2 x 1400-mm-ID rising mains between Terminal Pumping Station to the nearby and existing Doha South Sewerage Treatment Plant
- Ancillary buildings and facilities

JNP's Scope of Work - Interior & Exterior Painting Supply & Apply

IMG_4435.jpg
IMG_4439.jpg
IMG_2096.jpg